Search
Search Results (3 CVEs found)
| CVE | Vendors | Products | Updated | CVSS v3.1 |
|---|---|---|---|---|
| CVE-2021-2351 | 1 Oracle | 111 Advanced Networking Option, Agile Engineering Data Management, Agile Product Lifecycle Management and 108 more | 2026-11-02 | 8.3 High |
| Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H). | ||||
| CVE-2019-10219 | 3 Netapp, Oracle, Redhat | 198 Active Iq Unified Manager, Element, Management Services For Element Software And Netapp Hci and 195 more | 2026-10-08 | 6.1 Medium |
| A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack. | ||||
| CVE-2018-0734 | 7 Canonical, Debian, Netapp and 4 more | 23 Ubuntu Linux, Debian Linux, Cloud Backup and 20 more | 2026-10-08 | 5.9 Medium |
| The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.0.2q (Affected 1.0.2-1.0.2p). | ||||
Page 1 of 1.